Signature Projects
Government, healthcare, industrial, hospitality and education — the projects our equipment runs in.
National & Government Infrastructure
7 projects
We engineer fail-safe HVAC systems for Egypt's national infrastructure and government mega-projects, delivered to the highest standards of reliability and precision.
- The OctagonState Strategic Command Center
- NAC Government DistrictMinistries Sector
- Toshka Mega ProjectPump Station 2
- NAC MinistriesJustice & Irrigation Headquarters
- NAC Knowledge City
- Beni Suef Power Plant
- CAICairo International Airport
Commercial, Cultural & Hospitality
10 projects
- Grand Egyptian Museum (GEM)
- Alamein Iconic TowersNew Alamein
- Al Masa HotelNew Alamein
- NAC CBDCentral Business District Towers
- Giza Palace Hotel
- The Great Transfiguration ProjectSt. Catherine
- Marassi H9
- The Pearl TowersQatar
- Mivida Downtown
- Marina Hotel
Museums, towers, hotels and retail, where air distribution has to stay out of sight and out of earshot: linear slot diffusers along the ceiling line, decorative air curtains at the entrances and acoustically treated plant rooms.
Healthcare & Pharma
18 projects
- CapitalMedMedical City
- GSKGlaxoSmithKline Pharmaceuticals
- EIPICOEgyptian International Pharmaceutical Industries
- ASSIHAs-Salam International Hospital
- Hikma Pharmaceuticals
- OlymedMedical Products Manufacturing
- VACSERAVaccine Preparation Facility
- Minapharm Pharmaceuticals
- Sports Medical HospitalEgypt International Olympic City
- Memphis Pharmaceuticals
- Alexandria & El Shatby General Hospitals
- Kafr El-Sheikh Oncology Hospital
- Women's Health HospitalDamietta
- Allmed Middle EastMedical Manufacturing
- Tripoli General HospitalLibya
- Al-Jalaa HospitalLibya Case study
- Benghazi Medical CenterLibya
- Tobruk HospitalLibya, in progress
In this sector, air is not a service. It is a control parameter.
In an operating theatre or a sterile production suite, air is measured, not assumed. Expert builds hygienic air handling units to VDI 6022 and DIN 1946 Part 4: bacteria-resistant electrostatic coatings, thermal-break profiles, and crevice-free, fully drainable interiors. Every unit is engineered to hold cleanroom classification, pressure cascade and filtration integrity, not only on commissioning day but shift after shift, for years.
Industrial & Factories
12 projects
- Pirelli FactoryAlexandria
- Samsung FactoryBeni Suef
- PepsiCo Mega FactoriesOctober, Obour, Tanta
- Ezz Steel FactorySadat City
- PatchiChocolate Manufacturing Facility
- SECOSALT Factory
- Royal Factory
- Noubaria Yeast Factory
- TITaghleef Industries
- Misr Foods
- Rexam EgyptCan Manufacturing
- Coca-Cola PlantsAmreya & Sadat City
Factories and process plants, where the air system runs around the clock against heat, dust and process fumes: fully welded black steel ductwork up to 4.0 mm, heavy-duty air handling units and industrial air curtains at the loading doors.
Education & Sports
10 projects
- Zewail CityScience and Technology
- E-JUSTEgypt-Japan University of Science and Technology
- AASTMTArab Academy for Science, Technology & Maritime Transport (Alamein)
- NUNile University
- Egypt's National UniversitiesBenha, Port Said, Menoufia
- October Technological University
- UofCanadaUniversities of Canada in Egypt (NAC)
- KSIUKing Salman International University
- ISCInternational School of Choueifat
- NAC Sports CitySwimming & Squash Complexes
Universities, schools and sports complexes: high occupancy and large volumes, in halls that have to stay quiet.
Let’s talk about your project.
Our engineering team is ready to answer your questions and support your project at every stage.